
Execution
Substrate prepared, defects repaired, premium acrylic laid, lines marked to the millimetre.
Most courts complete in 3–7 working days, weather permittingThis is the part everyone pictures, and the part where shortcuts cost you years. Our crew prepares the substrate, repairs defects properly, builds the surface in layers with correct cure time between them, and finishes with line marking measured and masked to the millimetre.
3–7 days
Layered acrylic
Millimetre
What Actually Happens
No mystery, no jargon — the real sequence on your court.
Deep clean and surface preparation
High-pressure cleaning strips dirt, moss, chalking and loose material. Failed coating is removed rather than coated over, because new acrylic can only be as sound as whatever sits beneath it.
Crack repair and patching
Cracks are cut out, cleaned and filled with the right compound for the movement type. Low spots and ponding areas are levelled with patch binder so water sheds instead of sitting and lifting the coating.
Priming and binding
Where the substrate calls for it, we prime to guarantee adhesion. This is the invisible step that decides whether your surface is still bonded in five years or peeling in eighteen months.
Layered acrylic build-up
Resurfacer and colour coats are applied in multiple passes, each given proper cure time. Layering is what delivers even colour, consistent ball response and the grip level chosen for your sport.
Precision line marking
Line marking is the craft the Speedy name was built on. Every layout is measured, chalked, masked and hand-rolled to sport-specific dimensions with sharp, straight, durable edges — no wobble, no bleed.
Logos, crests and centre graphics
Custom centre logos, school crests, club emblems and feature graphics are cut and applied on the finished surface, turning a functional court into something people photograph.
A tidy, safe, communicative site
The area is contained and signed, the site is left clean each day, and you are told what is happening tomorrow. Court work should not disrupt a school, a club or a household any more than it must.
What's Included
- High-pressure clean and full surface preparation
- Structural and hairline crack repair
- Levelling of low spots and ponding areas
- Priming where the substrate requires it
- Multiple layered acrylic colour coats
- Standards-based precision line marking
- Custom logos, crests and centre graphics
What You Receive
- A fully cured, evenly coloured playing surface
- Crisp, accurate markings for every sport specified
- Your logo or crest applied to a professional standard
- A clean, safe site handed back each evening
- Daily progress updates from your named contact

A school court rebuilt in a single holiday window — high-grip coating, crisp multi-sport marking.
Mistakes We Never Make
The shortcuts that ruin courts — and why you will not see them here.
Coating over failed or peeling paint to save a day
Rushing cure time between coats because rain is forecast
Marking lines by eye rather than measuring the layout
Leaving tools, tape and debris on a client's site overnight
Execution across Sydney & NSW
Our crews resurface and mark courts right across Sydney and NSW — schools in the Shire and western Sydney, clubs in Wollongong and Newcastle, councils through Goulburn, Queanbeyan and Canberra. Because we operate round the clock, work can run outside school hours or trading hours where a site needs it.